Empty glass and cans arrive in different pallet configurations. Before asking whether one machine can handle both, obtain the layer drawing, container weight and packaging materials for each. Ask what layer-retaining and transfer equipment is fitted. Confirm how damaged or mismatched incoming loads will be assessed by the site.
Compare the first complete layer under approved conditions
Use both supplier packs. Observe support, separator handling and stable transfer to the correct downstream equipment. If the can system uses a different sheet or discharge arrangement, make the additional parts and trial a named scope item.
| Checkpoint | Aluminium cans | Empty glass |
|---|---|---|
| Incoming layer and separator | Document the can count and layer protection | Document the glass count, pattern and protection |
| Movement from pallet | Confirm support for the light layer | Verify bottle stability during the transfer |
| First downstream station | Identify the actual can-handling handoff | Identify bottle transport and accepted orientation |
| Change across materials | ___ | ___ |
Compare the empty-glass path within the complete line
Compare two incoming pallet formats
Send drawings, layer patterns, protection and target units per hour.