A depalletizer that fits below the ceiling while stopped can still need additional space above a loaded pallet or moving assembly at the tallest position. Ask the seller for a dimensioned drawing tied to the offered configuration. Ask the installer to measure the proposed site along the inbound route, at the operating position and where service access is required.
Measure from the same reference
Use the finished floor as a shared datum. Record the true lowest obstruction in the relevant zone, including beams, lighting and any services. Separately identify the loaded-pallet height, equipment height when installed and maximum operating position reported by the supplier. If the machine moved in sections, request the delivery envelope for each section.
| Measurement | What to check | Value or drawing |
|---|---|---|
| Lowest obstruction in operating zone | Measure at actual planned location | ___ |
| Highest travelling machine point | Include the motion required for the tall pallet | ___ |
| Pallet path in and out | Check doorways, slopes and handling vehicle | ___ |
| Service positions | Record guard opening and removal space | ___ |
| Unloading or lifting access | Check temporary site needs with installer | ___ |
Use the calculation to identify missing evidence
For example, if the lowest obstruction is at 3,400 mm and the highest point in the documented operating envelope is at 3,150 mm, their arithmetic difference is 250 mm. Confirm the clearance the equipment and installation actually require with the site and supplier. An unverified crane, service or pallet-handling clearance stays open in the offer.
Plan the equipment move and site-readiness survey
Check a depalletizer against your hall
Send measured heights, pallet dimensions, equipment reference and delivery route.